Health & Safety

The HECA project will be designed, constructed and operated to meet or exceed the highest local, state and federal environmental, safety and health standards to protect the public and the workers at the facility.

The HECA project will meet strict operating standards through its responsible feedstock handling and storage, a gasification process that will capture sulfur and other compounds and state of the art emission controls to achieve/exceed Best Achievable Control Technology (BACT) emissions.  These emissions will be recycled to increase efficiency and reduce venting.  And last, but not least, HECA will re-use non-potable water.